Complete removal of active K&T wiring and rewiring to modern code. Includes drywall patching but not painting.
Replacing a 60/100 Amp fuse box or Federal Pacific panel with a new 200 Amp breaker panel. Includes new service drop.
Replacing restrictive galvanized steel pipes with PEX or Copper. Restores water pressure.
Excavation and replacement of collapsed clay sewer lateral from house to city main.
Installing steel earth anchors to stabilize a bowing block wall (per plate).
Replacing broken tiles, securing loose slates, and flashing repair. Essential annual maintenance.
Need a verified quote? We have a list of trusted Detroit trades.
View Contractor List →